Our Certified Clean promise enabled the recycler to be confident their petroleum product would not be contaminated by transfer to the frac tank for temporary storage.
E-Tank is not only capable of emergency solutions, but we effectively coordinate with our clients during their planning process on complex projects. An oil recycler contacted us for assistance while they repaired a large storage tank at the plant. The tank had to be drained to perform the fix, and the customer needed additional onsite storage capacity.
The solution involved placing a frac tank inside a containment dike which required the use of a crane. Because of the complexity of this operation, we had to coordinate closely with the client to schedule the placement amidst the daily routine at the plant. Once in place, the frac tank was needed through the winter months, so E-Tank also installed a submersible pump within to keep the liquid circulating when it was likely to freeze.
The liquid transferred from the permanent tank to our frac tank was a saleable product. This is where E-Tank’s commitment to quality was most important to the recycler. Our Certified Clean promise enabled the recycler to be confident their petroleum product would not be contaminated by transfer to the frac tank for temporary storage.